Dec 02, 2021

How to install the cooler

Leave a message

Cooler installation methods are divided into vertical oil coolers and horizontal oil coolers. Vertical coolers have the characteristics of small installation area and convenient installation. The horizontal oil cooler has the characteristics of small pressure drop and strong water shock resistance. Therefore, the vertical or horizontal oil cooler can be selected correctly according to the requirements of different sites, space heights, and performance requirements to better meet the requirements of the generator set And other equipment needs.

(1) The cooler can be put into use only after passing the pressure test, and the internal water can be drained before it is activated.

(2) Check whether the inverted shower and vent valves are flexible and easy to use, their switch positions, and whether the pressure gauges and thermometers are all installed.

(3) Check whether the foundation and support are firm, and whether the bolts of each part are fully buckled and tightened.

(4) When putting into use, put the cold flow first and then the hot flow.

(5) When using cold or hot media, first ensure that the secondary line is unblocked, and then slowly open the outlet valve. After checking that there is no problem, open the inlet valve. It must be opened slowly to prevent pressure holding. Pay attention to the changes of equipment during the commissioning process. After the cooler is put into use, as the temperature and pressure change, leakage may occur, and it should be checked in time.


Send Inquiry